Projects
Home /Projects
Projects
Mining On Going Projects (FY 2022-23)
S No. | Client | State | Work | Ore |
---|---|---|---|---|
1 | Hindustan Copper Limited |
Jharkhand | Mine Development, Operation and Maintenance of Surda Mine, Jharkhand India |
Copper |
2 | Hindustan Copper Limited |
M.P | Underground Mine Developmental work at Malanjkhand Copper Project |
Copper |
3 | Hindustan Zinc Limited |
Rajasthan | Mine Development & ore production at Baroi Mines |
Zinc |
4 | Tata Steel Ltd | Jharkhand | Site Scientific study along with Extraction of XI seam of Jamadoba Colliery using suitable blastless technology along |
Coal |
5 | Manganese Ore India Limited |
MP | Sinking, lining and equipping of shaft with supply, installation and commissioning of 550 KW winder at Ukwa Mine. |
Manganese |
6 | Hindustan Copper Limited |
Rajasthan | Supply, Operation & Maintenance of undeground equipment at HCL Kolihan Mine of Khetri Complex |
Copper |
7 | Hindustan Copper limited |
Jharkhand | Reopening, Operation & expansion of closed Kendadih copper mine, ICC |
Copper |
8a | Indian Metals & Ferro Alloys Limited |
Odisha | Underground Mine Development and production at Mahagiri Chromite Mines |
Chromite |
8b | Indian Metals & Ferro Alloys Limited |
Odisha | Hiring of Machinery for Drilling, Mucking &Tramming of Ores at Mahagiri chromite Mines |
Chromite |
8c | Indian Metals & Ferro Alloys Limited |
Odisha | BOO Contract for Installation, Operation & Maintenance of Plant & equipment for Backfilling of stopes at Mahagiri Mines |
Chromite |
9 | Eastern Coal Field Limited |
Raniganj Area |
Conversion of Steam to Electric Winders | Coal |
Exploration On Going Projects (FY 2022-23)
S No. | CLIENT DETAILS | MINERALS | QUANTUM IN MTR. | DEPTH RANGE (IN MTR.) |
---|---|---|---|---|
1 | Tata Steel Limited | Iron, coal | 90,000m | <1100m |
2 | Central Mine Planning & Designing Institute Limited |
Coal | 3,50,000m | <650m |
3 | Atomic Mineral Directorate for Exploration & Research |
Niobium (Nb), Tantalum (Ta), Lithium (Li), Beryllium (Be), Cesium |
2,50,000m | <600m |
4 | Geological Survey of India | Geo-engineering – Geotechnical Projects, natural hazard mitigation studies, Glaciology, etc |
68,000m | <1300m |
5 | Hindustan Zinc Limited | Zinc, lead, silver | 2,00,000m | <1400m |
6 | Mineral Exploration Corporation Ltd. |
Coal, Lignite, Bauxite, Copper, Gold, Lead- Zinc, Iron Ore, Limestone, Manganese, Magnesite, Chromite |
56,000m | <1100m |
7 | The Singareni Collieries Co. Ltd. |
Coal | 16,450m | <500m |
8 | Chhattisgarh Mineral Development Corp. |
Bauxite, Limestone, Dolomite and Corundum, Coal & Iron |
32,000m | <100m |
9 | Orissa Mining Corporation | Chrome, Iron, and manganese |
70,000m | <150m |
10 | ONGC Limited | Uranium and Helium | 79,050m | <800m |
11 | Madhyapara Project (Bangladesh) |
Granite | 4500m | <450m |
12 | Director of Geology, Odisha |
Iron ore, Manganese, Chromite, Bauxite, Base metal, Limestone, graphite, coal, Gemstone, Dolomite, China Clay, Pyrophyllite, Decorative Stones, Quartz and Quartzite |
30,000m | <150m |
13 | Eastern Coalfields Limited | Coal | 1000m | |
14 | Jindal Stainless Limited | Iron, Chromite | 5000m | <600m |
15 | Moil Ltd. | Manganese | 22,400m | <400m |
16 | JSW Group | Coal, Iron | 10461m | < 1250 m |
17 | Chandi Steel Limited | Coal | 16526m | < 650 m |
18 | Andal East Coal Company | Coal | 16235m | < 850 m |
19 | Great Eastern Energy | Coal | 5951m | < 1200 m |
20 | Maharashtra State Power | Coal | 12021m | < 350 m |
21 | Maharashtra State Mineral | Coal | 5605m | < 300 m |
22 | Rio Tinto Exploration | Coal | 2750m | < 450 m |
23 | Core Mining Congo SARL | Coal | 25000m | < 450 m |
24 | IMFA & UCIL | Chromite, Uranium, Coal | 13365m | < 250 m |
25 | SME Limited | Coal | 11403m | < 700 m |
26 | Ballasore Alloys Limited | Chromium and Iron | 11736m | < 120 m |
27 | Joy Prakash | Limestone | 6500m | < 200 m |
28 | National Hydro Power | Geotechnical Project | 8200m | < 200 m |
29 | National Hydro Power | Geotechnical Project | 22090.01m | < 150 m |
30 | Ircon International Limited | Geotechnical Project | 3700m | < 400 m |
31 | Adhunik Cement Limited | Limestone | 1440m | < 150 m |
Winders
SL No. | Work | Date of Completion | Type of Project | Inclusive of |
---|---|---|---|---|
1 | Shantikhani 600 KW AC Winders | 31-12-2019 | EPC Project | Head Gear /Winder/ Electricals/ Motors/ Loading/Cage/Pulley etc |
2 | IMFA Winder 450 KW AC Winders | 31-12-2019 | EPC Project | Head Gear /Winder/ Electricals/Motors/ Loading& Unloading System /Skip/Cage/Pulley etc |
3 | Kandri Shaft Deepening 250 KW AC Winders | 12-09-2018 | EPC Project | Head Gear /Winder/Electricals/Motors/ Loading& Unloading System /Skip/Cage/Pulley etc |
4 | Chikla Deepening of Shaft & Winder 464 KW | 05-10-2015 | EPC Project | Head Gear /Winder/Electricals/Motors/ Loading& Unloading System /Skip/Cage/Pulley etc |
5 | Balaghat Ventilation Shaft sinking & Winder 250 KW AC | 31-08-2019 | EPC Project | Head Gear /Winder/Electricals/Motors/ Loading& Unloading System /Skip/Cage/Pulley etc |
6 | Chikla Shaft sinking with Winder commission 300 KW AC | 28-02-2019 | EPC Project | Head Gear /Winder/Electricals/Motors/ Loading& Unloading System /Skip/ Cage/Pulley etc |
7 | HCL Kendadih 425 KW AC Winder | 16-04-2016 | EPC Project | Head Gear /Winder/Electricals/Motors/ Loading& Unloading System/ Skip/Cage/Pulley etc |
8 | MOIL Munsar – 185KW DC Winder | 30-11-2014 | EPC Project | Head Gear /Winder/Electricals/Motors/ Loading& Unloading System /Skip/Cage/Pulley etc |
9 | Converting old steam winders into new electrical driven system with safety features as per DGMS guidelines along with AMC for 9 years at 6 locations of Eastern Coal Field Ltd. namely JK Nagar, Lower Kenda, Nimcha, Pandaveswar, Kunustoria, Shyamsunderpur. |
Shaft Sinkings
Sr. No. | Project Name | Overview | Client |
---|---|---|---|
400mtr and above Depth | |||
1 | Incline shaft with walling, roofing of open excavation at Kurja Mines | 650 M length | SECL |
2 | Sinking of a return air shaft at Adriyala Project | 6.5 Mtr dia & 584 Mtr. depth | SCCL |
3 | Designing, Sinking, Lining & Equipping of Vertical Shaft at Bagjata Mine | 5 Mtr dia & 425 M depth. | UCIL |
300mtr to 400mtr Depth | |||
1 | Sinking, lining and equipping of shaft with supply, installation and commissioning of 550 KW winder at Ukwa Mine. | 5.5 Mtr dia & 374 Mtr depth. | MOIL |
2 | Sinking, lining and equipping of a Man winding shaft with supply, installation and commissioning of 450 KW winder at Mahagiri Mine (MMC) IMFA. | 4.5 Mtr dia and approximate 300 Mtr depth. | IMFA |
200mtr to 300mtr Depth | |||
1 | Sinking of a return air shaft at JK Nagar, Pit No.2 | 6.5 Mtr dia & 280 Mtr. depth | ECL |
2 | Sinking of Shaft at Amrit Nagar Coal Project, Pit No.3 | 6.5 Mtr dia & 273 Mtr. depth | ECL |
3 | Sinking of Shaft at Sarpi Mine, Pit No.2 | 6.5 Mtr dia & 260 Mtr. depth | ECL |
4 | Sinking of a return air shaft at GDK No. 9 Incline | 6.0 Mtr dia & 220 Mtr. depth | SCCL |
5 | Sinking of a Man winding shaft at GDK No. 10A Incline | 6.0 Mtr dia & 200 Mtr. depth | SCCL |
6 | Sinking of a return air shaft at GDK No. 10 Incline | 5.5 Mtr dia & 200 Mtr. depth | SCCL |
7 | Sinking, lining and equipping of shaft with allied works at Gumgaon Mine | 4.5 Mtr dia & 200 Mtr depth | MOIL |
8 | Deepening of Holmes shaft, equipping and construction of loading chamber with allied works at Balaghat Mine | 6.5 Mtr. x 5 Mtr. & 200 Mtr depth | MOIL |
9 | Excavation, Sinking & Lining of East Ventilation Shaft at Turamdih Mines. | 4.5 Mtr dia & 180 Mtr depth | UCIL |
100mtr to 200mtr Depth | |||
1 | Sinking and Lining of shaft at Sheetaldhara project | 6.5 M dia & 165 M depth | SECL |
2 | Sinking and Lining of shaft at Sheetaldhara project | 6.0 M dia & 160 M depth | SECL |
3 | Sinking, lining and equipping of shaft with supply, installation and commissioning of 250 KW winder at Munsar Mine | 4.5 Mtr dia & 164 Mtr depth | MOIL |
4 | Sinking, lining and equipping of shaft with supply, installation and commissioning of 250 KW winder at Chikhla Mine | 4.5 Mtr dia & 160 Mtr depth | MOIL |
5 | Deepening of Production shaft, equipping and construction of loading chamber with allied works at Balaghat Mine | 4.5 Mtr dia & 150 Mtr. depth | MOIL |
6 | Sinking and lining of a shaft at Nawapara project of Bhatgaon area | 140 Mtr | SECL |
7 | Sinking of a return air shaft at GDK No. 1 Incline | 4.5 Mtr dia & 140 Mtr. depth | SCCL |
8 | Deepening of vertical shaft and allied work at Chikla Mine | 4.5 Mtr dia & 120 Mtr depth | MOIL |
100mtr to 200mtr Depth | |||
1 | Shaft deepening, Equipping, supply and Installation of ore handling system and allied excavation at Khetri Mine, Rajasthan | Production Shaft- 5.5 Mtr. dia & 100M depth; Service shaft- 5.5 M & 100 Mtr depth; BGML Shaft | HCL |
2 | Sinking & Lining of Two numbers of Ventilation Shaft at Mohuldih Mines | 4.5 Mtr dia, 100 Mtr depth | UCIL |
3 | Sinking and lining of a ventilation shaft at Balaghat Mine | 4.5 M dia & 99 Mtr depth | MOIL |
4 | Deepening of vertical shaft and allied work at Kandri Mine | 4.2 Mtr dia & 60 Mtr depth | MOIL |
5 | Sinking and lining of a high-speed service winze at Munsar Mine | 4.5 M dia & 44 M depth | MOIL |
6 | Sinking and lining of a ventilation shaft at Mahagiri Mines (MMC) | 5 Mtr dia & 41 Mtr depth | IMFA |
Drivage & Man winding Installations | |||
1 | Underground drivage at Padmavati Mine | 980 M length | SECL |
2 | Underground drivage at Kurja mine | 500 M length | SECL |
3 | Supply, Installation & commissioning of a 600 KW winder along with fabrication and erection of headgear and equipping of shaft at Shantikhani | 375 Mtr depth | SCCL |
4 | 425 KW Man Winding Installations at Kendadih Mine | 500 Mtr Length | HCL |
5 | Equipping of a Man winding shaft at Charcha Mine of Baikunthpur area | 325 Mtr. Depth | SECL |